Nomade – Refit
THE WORK DONE
- Works done within the scope of 5-Year Rina control
- Main Engine Propulsion System – Change of bearings and sealing equipment
- General Pump Maintenance
Overview
Specification
Equipment
Accommodation
Price from:
38 Metre - Sheet Metal / Aluminum Location:
Tansu
Sleeping places:
1
Capacity:
1
Speed:
20 Metre


